|
There is essentially only one water pipe (for the front outside). It has a spicket(sp?) and I will leave an access panel for that. Other than that there is two heating/cooling ducts (one in each room) and conduit. I am going to get rid of all the conduit and put in romex so I will drill holes through the floor joists for that. Therefore, all I would need access to is the spicket. The reason I want to put up drywall is to get the extra 3-4". The ceiling is only 83" from floor to the joists. With the old panelling it was about 80 max. I am 6'2" so that is 74", I want the most height I can get. What do you think?
|