View Single Post
  #1 (permalink)  
Old 08-17-2004, 01:42 AM
Scott Neumann Scott Neumann is offline
New Member
 
Join Date: Jul 2004
Location: .
Posts: 8
Thanks: 0
Thanked 0 Times in 0 Posts
Scott Neumann is an unknown quantity at this point
Concrete driveway help

How long should I let my new concrete driveway dry out? I live in the Pacific NW, and it has been in the 70's to 90's since it has been laid. I have heard that a month is about standard. I have no coloring, stains or sealers on it, yet. Can I drive my car on it into the garage, which was not re-done? It will be 3 weeks on Friday since it was poured. Also, another ? is what is the best way to seal it after it is "cured" and finished drying out? Is it possible to put a stain on the new concrete before sealing? Also, if I apply stain and sealant, do I have to reapply on a yearly basis or ? Thanks for your help!
Reply With Quote