I would like to revisit this thread... I have a similar question and was wondering where to find more info. We are redoing a kitchen and I might like to replace the feedlines with copper. Eventually we may want to do the whole house.
Currently, the house is fed by a 3/4" CU main, but everything after that is 5/8" (I think... ~7/8" OD) galvanized pipe. There is one kitchen sink, two bathroom sinks, one shower and two toilets plus the utility sink and washer - all within about 15-20ft of the main supply. We plan to add a dishwasher.
Any advice or clues about good reading material?
|