|
I installed a lamanent floor in my bathroom and leaving the required 1/4 gap was needed in front of tub I handled this by getting 3/4 inch quarter round foam not wood from Home Depot and used finish nails to nail into floor though the 1/4 gap....looks good and will never open up again.
Gerry
|