|
First off, can we assume the power is OFF??? I hope so.
If not then you need to get the POCO out to kill power to the meter, AND to open the meter, so you can work on it.
They can also tell you THEIR requirements for where the grounding electrode conductor goes.
*EDIT* (Sorry Hazee, I misread the post.)
You WILL have to get this inspected.
__________________
No, that's not me in the avatar. I just like the picture.
Last edited by Speedy Petey; 03-08-2008 at 05:13 PM.
Reason: Edit out incorrect statement.
|