Quote:
Originally Posted by HayZee518
I had a quote for a hydrionic system at my house in northern ny. It all came in at $22,000 and as you I am very fluid in installations of plumbing and copper sweating. I was licensed for the electrical for 35 years so I got that covered too. I was quoted $12,000 for a boiler, baseboard units valves etc.
The ductless unit I was quoted about $2500 so that and the $12,000 kinda blows your $500 budget out the window.
|
The $500 was only for the design on paper and parts list. Fortunately I found a local guy that does it for $80 per hour and that should work.