View Single Post
  #1 (permalink)  
Old 01-03-2009, 11:33 AM
Freddiy Freddiy is offline
New Member
 
Join Date: Jan 2009
Posts: 7
Thanks: 2
Thanked 0 Times in 0 Posts
Freddiy is an unknown quantity at this point
Question Is this basement bathroom Plumbing Plan ok?

Is this plumbing plan ok? I am finishing a bathroom in my basement. Wanting to add a vanity sink, toilet, shower and a wet bar just outside the bathroom. The builder only roughed in the toilet (3” drain) and a 2” vent pipe. See the attached sketchs of the existing rough-in and my proposed plan. Is the proposed plan ok? It looks like a lot of piping but is the only thing I could come up with to meet code as I understand it. Can this be simplified? I’m trying to minimize the amount of concrete I have to bust up. I live in Ohio just outside Cincinnati.
Thanks Fred.
Attached Images
File Type: jpg Existing rough-in.jpg (30.0 KB, 43 views)
File Type: jpg proposed plan1.jpg (38.5 KB, 43 views)

Last edited by Freddiy; 01-03-2009 at 12:24 PM..
Reply With Quote