View Single Post
  #5 (permalink)  
Old 01-04-2009, 09:04 PM
Freddiy Freddiy is offline
New Member
 
Join Date: Jan 2009
Posts: 7
Thanks: 2
Thanked 0 Times in 0 Posts
Freddiy is an unknown quantity at this point
Smile

Jnaas2, Thanks for the quick reply. I've attached a floor plan that should give you the data you requested. I've also attached an update to my piping plan. I moved the shower tie-in closer to the toilet stub up. Now it is 12" from center of shower tie-in connection to center of toilet stub-up. Is this ok? This allows me to leave the existing under slab piping as is and only cut into the 3" main at one place making a simplier tie-in. Not sure why I was thinking of moving the location of the other connections peviously? As you can see from the floor plan the 3" pipe from the toilet stub-up runs outside the shower area so I'll have to cut the floor to run the shower pipe under the shower area. Also I have already busted up a bunch of the concrete. I had to do this so that I could see what was under the floor and where the pipe runs were. Thanks for your help.
Fred
Attached Images
File Type: jpg Basement bathroom floor plan.jpg (72.4 KB, 38 views)
File Type: jpg proposed plan1 updated.jpg (40.5 KB, 28 views)
Reply With Quote