Thread
:
Installing a Sump
View Single Post
#
3
(
permalink
)
01-10-2009, 12:10 PM
rdw5466
New Member
Join Date: Jan 2009
Posts: 14
Thanks: 2
Thanked 0 Times in 0 Posts
Thanks for thereply. I have considered a check valve, just didn't know if it would really work. Would it need to go onto the end of the tile, or upstream? The ditch is about 48" deep at the tile discharge and it's near the bottom.
rdw5466
View Public Profile
Send a private message to rdw5466
Find all posts by rdw5466