|
ok, thanks. It looks like that shower is not going to get used for awhile until we can afford to replace it. It seems stupid to replace just the shower in that small, substandard bathroom. All the cabinetry and hardware that was used is really cheap, along with the tile floor. I wonder if a remodel could realistically be done in stages, starting with the shower. Thank god for the second bathroom.
Can you recommend a method for finding a contractor who uses that Kerdi method? I'm afraid if I just ask around, I might end up with someone who says they know to use the material, but actually has no experience with it. I think a lot of contractors in Michigan right now are a bit desperate for work.
|