View Single Post
  #6 (permalink)  
Old 06-30-2009, 09:02 PM
pushkins's Avatar
pushkins pushkins is offline
Contractor
 
Join Date: Mar 2006
Location: North Carolina
Posts: 905
Thanks: 0
Thanked 44 Times in 42 Posts
pushkins will become famous soon enough
Yes it is, my reservation is in line of after you complete the repair you will ultimately have two concrete sections with a medium bond then your going to add a third over the top of the two, all three will expand and contract at slightly different amounts this will put a huge strain of the top skim coat that will only be 1/8" thick and cover the entire 12" x 12' area.
I'd hate to see you add the skim coat only to see that one crack away.
__________________
Reply With Quote
The Following User Says Thank You to pushkins For This Useful Post:
loosescrew (06-30-2009)