View Single Post
  #4 (permalink)  
Old 01-17-2005, 03:11 PM
imeduc imeduc is offline
Apprentice
 
Join Date: Apr 2004
Location: FL, USA.
Posts: 330
Thanks: 0
Thanked 0 Times in 0 Posts
imeduc is an unknown quantity at this point
In the basement runs we use a 6" pipe and take off to a 2"X12"-6" 90o boot. this gives you a much better throw down for heat in the basement nail the boot to a joist and yes cut up 3/4" on the side and turn the tabs out above the drywall this will give the registers screws some thing to hold to. 5X10 on a 5 " pipe wont cut it.

ED

My mistakes dont define me they inform me.
Reply With Quote