Home Repair Forum



Reply
 
Thread Tools Display Modes
  #1 (permalink)  
Old 01-14-2005, 07:14 PM
New Member
 
Join Date: Jan 2005
Location: Great Mills, MD, USA.
Posts: 12
Thanks: 0
Thanked 0 Times in 0 Posts
jbaratta is an unknown quantity at this point
How to prepare HVAC duct register opening?

Hi - I'm finishing my unfinished basement and running HVAC duct extensions out from the trunkline (which runs down the center of the house) out into the new rooms. I'm using 5" pull-offs and 5" round pipe to end at 4"x10" rectangular register drops. The registers will be installed into the cielings in the room through the overhead drywall (which I'll install/cut later). Do I have to "frame in" the register ductwork (the 4"x10" sheetmetal) with backer so there's something to screw the register fasteners (screws) into? Or should I bend 1/2 inch of the register duct over the drywall cutout (making a slight "lip") for the screw to penetrate? Or will the register screws simply go into the drywall once installed? Also, how far down should the register ductwork hang for the rough-in: flush with the bottom of the cieling joists, or flush with the drywall (like electrical boxes), or extend beyond the drywall cutout by some amount and fold over flat? Haven't done this part before (the rest of the duct work seemed quite easy). Thanks!
Reply With Quote
  #2 (permalink)  
Old 01-14-2005, 07:43 PM
Handyman
 
Join Date: Dec 2004
Location: USA.
Posts: 43
Thanks: 0
Thanked 0 Times in 0 Posts
Dean is an unknown quantity at this point
The register boots should be flush with the finished Sheetrock.
If they are a little short of being flush it won't really hurt anything but naturally if they overhang then the registers will never be tight up against the Sheetrock.
Register boots that wind up hanging down too low are a bear to trim off later.
A register screw into Sheetrock will never hold, you need sheet metal or wood above the ceiling.
A sheet metal angle attached to the short sides of the register boot 1/2" (or the thickness of the ceiling) up from the edge work fairly well to hold the register screws and also to span across from joist to joist to hold the boot in place.

If the registers are going to be running longways in the bay then I would use a couple of 1 X 2's that would be on top of the ceiling attached to the boots .

One thing to keep in mind is any screw heads inside the boots need to be up high enough so they don't hinder the registers from going up inside and for that reason I would use small shingle nails when using wood.





Reply With Quote
  #3 (permalink)  
Old 01-14-2005, 07:50 PM
New Member
 
Join Date: Jan 2005
Location: Great Mills, MD, USA.
Posts: 12
Thanks: 0
Thanked 0 Times in 0 Posts
jbaratta is an unknown quantity at this point
Thanks Dean!!
Reply With Quote
  #4 (permalink)  
Old 01-17-2005, 04:11 PM
Apprentice
 
Join Date: Apr 2004
Location: FL, USA.
Posts: 330
Thanks: 0
Thanked 0 Times in 0 Posts
imeduc is an unknown quantity at this point
In the basement runs we use a 6" pipe and take off to a 2"X12"-6" 90o boot. this gives you a much better throw down for heat in the basement nail the boot to a joist and yes cut up 3/4" on the side and turn the tabs out above the drywall this will give the registers screws some thing to hold to. 5X10 on a 5 " pipe wont cut it.

ED

My mistakes dont define me they inform me.
Reply With Quote
Reply

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Stats
Members: 12,943
Threads: 7,777
Posts: 33,326
Top Poster: HayZee518 (4,977)
Welcome to our newest member, GLE3
» Online Users: 25
1 members and 24 guests
paul52446m
Most users ever online was 400, 06-22-2009 at 07:11 AM.
» Links

» Sponsors
Powered by vBadvanced CMPS v3.0.1

All times are GMT -5. The time now is 10:57 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.0