Home Repair Forum



Reply
 
Thread Tools Display Modes
  #1 (permalink)  
Old 03-25-2003, 06:21 PM
New Member
 
Join Date: Mar 2003
Location: .
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
Lilah is an unknown quantity at this point
dryer vent in crawl space

We are in the final stages of finishing our underground, south-facing passive solar home. We use the crawl space to circulate air from the green house through the house so it is relatively warm.

The dryer vent has to go down from the dryer, across about 15 feet of crawl space and outer wall, then up with a 90 degree turn (through soil) to the outside where there will have to be another 90 degree to face the vent flap out rather than up.

My questions:
1. Does anyone know why aluminum duct is recommended rather than 4" pvc? We can only find aluminum in two foot lengths which makes for a lot of joints and possible future problems.

2. If the two 90 degree turns at the end of the run are not going to work at all, please let me know. The only other possibility is to make a second cut through the outer wall which is two feet thick -- not an easy job and we don't really want to have to do it.

For those of you who wonder why we didn't plan ahead, we originally had the dryer vented directly out the one exterior wall but then a health change required a different bathroom layout and the dryer had to be placed in another location.

All suggestions, answers, and helpful hints gladly received. Thanks, Lilah
Reply With Quote
  #2 (permalink)  
Old 06-10-2003, 08:13 PM
New Member
 
Join Date: Jun 2003
Location: .
Posts: 7
Thanks: 0
Thanked 0 Times in 0 Posts
metalhd2 is an unknown quantity at this point
Lilah,

Universal code states a dryer vent has to terminate within
45' with each 90 degree turn equal to 10' of length. Your
configuration is okay in that the dryer vent fan will move the
air and lint to the outside. I would suggest 5' sections of
30 gauge galvanized pipe (4" diameter) until I reached the
interior wall. I would then install 4" PVC (Well Casing grade)
underground and up to a standard vinyl termination cap with flapper.
You might want to check with the local inspection authority on
the PVC section of your project but I think you will be okay.

Ed Tolbert
Hendersonville, NC
Reply With Quote
Reply

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Stats
Members: 12,946
Threads: 7,778
Posts: 33,327
Top Poster: HayZee518 (4,978)
Welcome to our newest member, mitchell123
» Online Users: 16
0 members and 16 guests
No Members online
Most users ever online was 400, 06-22-2009 at 07:11 AM.
» Links

» Sponsors
Powered by vBadvanced CMPS v3.0.1

All times are GMT -5. The time now is 06:11 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.0