What is a rough-in?

When I go to faucet web sites, they talk about "rough-in" what is it?

Sherky

Sherky Ng
Sales
Johnson and Phillips Canada LTD
Reply With Quote
  #2 (permalink)  
Old 12-25-2004, 03:57 AM
LazyPup's Avatar
Deity
 
Join Date: Apr 2004
Location: Youngstown, Ohio USA.
Posts: 2,258
Thanks: 0
Thanked 14 Times in 14 Posts
LazyPup has a spectacular aura about
"Rough in" is a trade term to define the approximate spacing of water or waste lines or in the case of sinks it may indicate the spacing between holes for the faucett to mount. By example, a water closet flange (toilet flange) is properly spaced 12 inches out from the wall behind the toilet and 15 inches assured clearance to either side from tubs, cabinets or walls.

It would also indicate the elevation (height) of supply valves were they come through the wall or it may indicate the spacing between holes in a sink top.

The rough in dimensions for a fixture, tub, shower stall, pedastal sink etc would indicate the required dimensions for framing or hangers that must be attached to the framing of the structure.

Basically in new construction plumbing is done in three phases,,,rough in,,,stack out...and trim out.

Rough in generally defines Running the water main from the source to the structure, running the sewer line from the municipal sewer tap or septic tank and underslab work, laying supply and waste lines that will be under the concrete slab.

The general contractor will consult with the plumber during this phase to determine the minimum required finished elevation of the slab, which is determined by computing the length of run and required pitch of the sewer line from the septic tank or municipal tap to the furthest floor drain fixture from that point.

Once the slab is completed and the framing is up we do the "Stack out" During stackout all the lines that will ultimately be in the walls are put in. Usually the DWV (Drain, waste and Vent) inspection and static head test is done at this stage. Once its approved the general contractor is notified he can proceed with wallboard or wall finish.

After the walls are finished and cabinets are set we do the "Trim Out" At this stage toilets and sinks are set, faucetts are attached and all final trim or fixtures are put in place.
Reply With Quote
  #3 (permalink)  
Old 12-25-2004, 04:58 AM
HayZee518's Avatar
Deity
 
Join Date: Jul 2004
Location: Saint Regis Falls, NY, USA.
Posts: 4,979
Thanks: 0
Thanked 102 Times in 102 Posts
HayZee518 will become famous soon enough
Send a message via Yahoo to HayZee518
Rough in means any construction without the finish work. i.e. open exposed studs, so that wires may be pulled in, plumbing installed without water in the lines, waste lines run etc.
Reply With Quote
  #4 (permalink)  
Old 01-04-2005, 07:41 AM
New Member
 
Join Date: Dec 2004
Location: Toronto, ON, Canada.
Posts: 8
Thanks: 0
Thanked 0 Times in 0 Posts
sherky is an unknown quantity at this point
Awesome! Thanks

Sherky Ng
Sales
Johnson and Phillips Canada LTD
Reply With Quote
  #5 (permalink)  
Old 01-04-2005, 07:44 AM
New Member
 
Join Date: Dec 2004
Location: Toronto, ON, Canada.
Posts: 8
Thanks: 0
Thanked 0 Times in 0 Posts
sherky is an unknown quantity at this point
Happy New Year to you all!


Sherky Ng
Sales
Johnson and Phillips Canada LTD
Reply With Quote
Reply

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Stats
Members: 12,948
Threads: 7,778
Posts: 33,328
Top Poster: HayZee518 (4,979)
Welcome to our newest member, laniganlosik
» Online Users: 59
0 members and 59 guests
No Members online
Most users ever online was 400, 06-22-2009 at 07:11 AM.
» Links

» Sponsors
Powered by vBadvanced CMPS v3.0.1

All times are GMT -5. The time now is 12:11 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.0