Home Repair Forum



Reply
 
Thread Tools Display Modes
  #1 (permalink)  
Old 10-15-2006, 10:21 PM
King
 
Join Date: Jan 2004
Location: .
Posts: 1,012
Thanks: 1
Thanked 5 Times in 5 Posts
mrcaptainbob will become famous soon enough
Water supply material...

In a previous thread, LazyPup mentioned "The code approved choices are Galvanized Iron Pipe (almost never used today), Copper, PEX or CPVC. (PVC prohibited)". Where does the black (material {?}) used from well pump to house fall in?
Reply With Quote
  #2 (permalink)  
Old 10-15-2006, 10:49 PM
LazyPup's Avatar
Deity
 
Join Date: Apr 2004
Location: Youngstown, Ohio USA.
Posts: 2,258
Thanks: 0
Thanked 14 Times in 14 Posts
LazyPup has a spectacular aura about
The Plumbing codes define the water lines in two classes..Supply and distribution.

Supply lines are the lines from the municipal main or well to the structure.

Distribution lines are the lines used to distribute the water inside the structure.

Under the International Residential Code the materials approved for Supply lines are:

ABS plastic pipe, Asbestos Cement Pipe, Brass pipe, Copper types K,L, & M both rigid and seamless roll pipe, Ductile Iron Pipe, Galvanized steel (may not be run under a slab),CPVC, Polybutelene, Polyethelene, PEX tubing, Pex-Al-Pex pipe and PVC.

For Distribution the IRC allows Brass Pipe, Copper types K.L & M both rigid and roll, CPVC,Galvanized steel (under slab it must be facotry wrapped and all joints field wrapped), Polybutelene(PB), Pex Tubing, Pex-Al_Pex pipe.

For Supply the Uniform Plumbing Code (UPC) permits Asbestos cement pipe, Brass pipe, Copper K, L and M, both rigid and roll pipe, CPVC, Ductile Iron (for direct burial it must be facotory wrapped and all joints field wrapped), Galvanized steel (for direct burial it must be facotory wrapped and all joints field wrapped), Polyethelene (PE),PEX tubing, PVC.

For Distribution the IRC limits it to Brass pipe, copper K,L,& M (type M only if a minimum of 6" above the floor),CPVC, Ductile iron (under slab it must be facotry wrapped and all joints field wrapped), Galvanized steel (under slab it must be facotry wrapped and all joints field wrapped), PEX tubing.
Reply With Quote
  #3 (permalink)  
Old 10-16-2006, 10:39 PM
King
 
Join Date: Jan 2004
Location: .
Posts: 1,012
Thanks: 1
Thanked 5 Times in 5 Posts
mrcaptainbob will become famous soon enough
Supply line info....

Thanks, LazyPup. Valuable info....answers many questions...(started a few, too).
Reply With Quote
Reply

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Stats
Members: 12,947
Threads: 7,778
Posts: 33,328
Top Poster: HayZee518 (4,979)
Welcome to our newest member, nolee
» Online Users: 41
1 members and 40 guests
nolee
Most users ever online was 400, 06-22-2009 at 07:11 AM.
» Links

» Sponsors
Powered by vBadvanced CMPS v3.0.1

All times are GMT -5. The time now is 09:50 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.0