Search:

Search: Search took 1.00 seconds.

  1. Replies
    9
    Views
    2,419

    Part prices

    This is what I paid for OEM parts.

    6119 plug packing $5.60
    6754 Combustion ring $68.54
    6130 chamber gasket $15.55
    6358 rope gasket $15.17
    6750 burner cloth $16.75 I received 2, one round...
  2. Replies
    41
    Views
    10,888

    a thermistor as used in the heater is a negative...

    a thermistor as used in the heater is a negative temperature device. as room temperature goes up, the resistivity of the device goes down and vice versa. I checked out a site and a 10K device seems...
  3. Thread: 16 year old 422

    by Bryand
    Replies
    41
    Views
    10,888

    They very seldom need replacing as they are not...

    They very seldom need replacing as they are not subjected to moisture. But if you have to it is not a big deal 20 min. max.
  4. Replies
    41
    Views
    10,888

    8813K11 is gasket material 1/8 thick 1 inch wide...

    8813K11 is gasket material 1/8 thick 1 inch wide
    8838K23 is burner mat material .040 thick 1 foot x 40 inches long - $11.40
    9323K21 is more gasket material
  5. Replies
    41
    Views
    10,888

    Monitor heaters

    I have looked backwards in several posts for parts from McMaster-Carr. Here's what I found:
    8813K11, 8838K2, 9323K21, Rutland cement #77 and #641
    Bearings for the combustion blower are an 8mm bore,...
  6. Replies
    41
    Views
    10,888

    Monitor parts

    Ford,

    When you get the pot out, flip it over and remove the insulating pad. If the bottom has any warps or cracks it needs to be replaced. If not, just clean the carbon out and replace the...
  7. Replies
    41
    Views
    10,888

    I think ebay has pretty much exhausted their...

    I think ebay has pretty much exhausted their supply of monitor parts. Adirondack Hardware in Keeseville NY has all the parts you need. Monitor stopped making the vented kerosene heater earlier this...
  8. Replies
    41
    Views
    10,888

    M422, 1996

    Ford,

    A Monitor 422 built in 1996 was one built in only the second year of that models run. You may have one of the early ones that had bushings instead on bearings in the combustion motor....
  9. Replies
    41
    Views
    10,888

    a complete overhaul is necessary. routine...

    a complete overhaul is necessary. routine maintenance doesn't address all the issues. start with the combustion blower. if it sounds like a jet engine starting up [whining] bearings need to be...
Results 1 to 9 of 9