Results 1 to 6 of 6

Thread: piers set up/deck

  1. #1
    Join Date
    Feb 2009
    Posts
    29
    Thanks {vb:rawphrase post_thanks_given 
    0
    Thanks Thanks Received 
    0
    Thanked in
    0 Posts

    piers set up/deck

    I have poured the concrete piers for a fairly low deck -2 ft deep in ground 8 inches round in sono tub with the rebar ,temp has been around 60-75 with low humidity in Tn for 2 days.When can i start placing the weight of deck on the piers ..?

  2. #2
    Join Date
    Jul 2004
    Location
    Saint Regis Falls, NY, USA.
    Posts
    8,740
    Thanks {vb:rawphrase post_thanks_given 
    1
    Thanks Thanks Received 
    484
    Thanked in
    470 Posts
    I was going to ask.....where are you located? piers usually go below the frost line so when it does get cold they don't shift.
    Oh, Tennessee I just spotted it.
    You can do it anytime now. Are you using post or beam hangers?

  3. #3
    Join Date
    Feb 2009
    Posts
    29
    Thanks {vb:rawphrase post_thanks_given 
    0
    Thanks Thanks Received 
    0
    Thanked in
    0 Posts
    ive placed in concrete the supports for beam to go on .
    Is it a good idea to pour a little more around the base area and slope the concrete away from pier ?
    the top or the pier is only 3 or 4 inches above ground .

  4. #4
    Join Date
    Jul 2004
    Location
    Saint Regis Falls, NY, USA.
    Posts
    8,740
    Thanks {vb:rawphrase post_thanks_given 
    1
    Thanks Thanks Received 
    484
    Thanked in
    470 Posts
    you're not gonna gain much by a skirt. I'd leave it alone. just put some crushed gravel around each post.

  5. #5
    Join Date
    Feb 2009
    Posts
    29
    Thanks {vb:rawphrase post_thanks_given 
    0
    Thanks Thanks Received 
    0
    Thanked in
    0 Posts
    thanks
    Ive already done that since this is a area i had to regrade and slope the water a certain direction .I had extra cement left over also..That helps with flowing on past the piers ,outside ones primarily since ground is flat at end ...

  6. #6
    Join Date
    Jul 2004
    Location
    Saint Regis Falls, NY, USA.
    Posts
    8,740
    Thanks {vb:rawphrase post_thanks_given 
    1
    Thanks Thanks Received 
    484
    Thanked in
    470 Posts
    use stainless steel screws for your outside beams to the anchor brackets. use joist hangers with ss screws along your shortest span between the outside framing and ledger strip on house.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)